Since February 2008, the working stage has begun in relation to the documents that define the design process. It was the act of February 2008 that introduced its own rules for the construction on the territory Russian Federation. Whatever month construction is underway - in December, April, May or August - you must approve the documents from the relevant authorities. This applies even overhaul on the object.

Government Decree 87 on the composition of project documentation,

For example, the first paragraph states that any explanations about the use of the Regulation, which is approved in the Resolution, are given directly by the Ministry of Construction of the Russian Federation. All other issues are resolved in accordance with the competence of specific bodies. executive power involved in the development of public policy.

Changes 2016

with changes contains several modifications compared to old version. For example, the development of estimated standards for the construction of a particular facility is carried out in accordance with the decision of the Government of the Russian Federation.

About the composition of sections project documentation according to the norms of the Russian Federation and specific requirements for registration, see Resolution 87. Many are interested in the current legislation and its explanations for this resolution, so you should find out what's new in this law appeared for this year, and what the list of its requirements looks like.

on the composition of project documentation

In writing this provision, the government referred to urban planning and its Russian code. According to Art. 48 of this code, the content of the documentation was established. The main requirements began to be submitted by the Ministry, under whose competence the construction is located, as well as the security service of the Federation. Also, the Federation can receive recommendations on the preparation of documents through the state transport authority. Additional requirement may fall under the introduction at the request of many other services. The first edition and clarifications were to come into force in February 2008. Then, at the end of February, a designation was given to each aspect of the requirements.

Amendments to the Federal Law on the composition of project documentation

Decree of the Government of the Russian Federation on the composition of project documentation dated February 16, 2008 87 with changes had to be approved in January 2016. Prior to this, more than one section, by decision of the government, was changed in April and at the end of April, in December, March, August, July, May and June of past years. Last revision by decision of the plenum, received a small addition, and some paragraph will be introduced in a new wording. Today you can read the editorial for free. dated 2016 through your computer or download the position plan.

The regulation of the Russian Federation on the composition of project documentation, as amended, contains the following sections:

  • Basic provisions;
  • The composition of the project for the linear construction process;
  • The composition of the sections on the capital production and non-production construction process.

Comments on Resolution 87

Recent comments on the planning documentation for this law make clear the relevance of the new provisions. For example, the federal law has a list of requirements for the working stage of design. In connection with the comments, one can more accurately understand what to do if the condition from a specific post in the law is met, how the power of this decree works and how the system conducts technological supervision.

Oath of the GIP according to the 87th resolution

This provision of the Russian Federation does not regulate the oath of the GIP, although there should be his note or an entry to the project. There must always be certification, seal and signature of the ISU. This allows you to provide information that the project scheme is written in accordance with the requirements, and the development is officially certified.

List of sections of project documentation according to 87 Federal Law

Depending on the construction for which this provision is required to be applied, the sample and the staging of the compilation change. In total, the addition to the law contains two types of construction - linear objects and capital construction. It is worth classifying an object and applying text and graphic design rules to it. Help on this subject is deprecated by many legal portals, such as a technical expert, consultant, or consultantplus. This suggests that today the order of writing projects is interesting for more than one organization. Worth checking the status for land plot, buildings and structures according to this law, and then follow it in writing.

General explanatory note on Decree 87

According to the text of the provision, the general explanatory note and its development are substantiated. The project must contain such volumes and sections that are described in the resolution. For example, an estimate, electricity supply, important codes, network availability, the environmental aspect of the project, safety and expertise, energy efficiency, and so on should be indicated. Also, the project itself should act as a guarantor of the correct development, for example, it is important to preserve the environment if it is a document for a nuclear plant or a car wash in Moscow. If an important public node is blocked, or if a piece of infrastructure needs to be removed, permits must be attached. TO finished document binding or folding can be used, and the date of acceptance is also put.

How can one relate to designers who apply thirty years ago a canceled norm? A litmus test showing a lack of knowledge in the field of design is the inclusion of the "GIP oath" in the general data.

The history goes back at least to GOST 21.102-79 "SPDS General data on working drawings":

"12. In the lower left corner of the first sheet of general data of each main set of working drawings, a record of the chief engineer of the project is placed in a rectangular frame, certifying the compliance of the project with the current norms and rules, and for buildings or structures with a fire hazardous and explosive nature of production, in addition, safe their operation subject to the measures envisaged by the project.

GOST 21.101-93, which replaced it, "SPDS Basic requirements for working documentation"repealed this rule:

" 2.5.4. The general instructions are:

4) a record that the technical solutions adopted in the working drawings comply with the requirements of environmental, sanitary and hygienic, fire safety, and other standards in force on the territory of the Russian Federation and ensure the safe operation of the facility for human life and health, subject to the measures provided for by the working drawings ;"

GOST 21.101-97, which replaced it, "SPDS Basic requirements for design and working documentation" simplified the necessary phrase even more:

"4.2.9 The general instructions give:

d) a record that the working drawings have been developed in accordance with applicable codes, rules and standards.

GOST R 21.1101-2013 currently in force in Russia "System of design documents for construction. Basic requirements for design and working documentation” contains the following phrase:

"4.3.5 The general instructions give:

- a record of the compliance of the working documentation with the design task issued by specifications, the requirements of the current technical regulations, standards, codes of practice, other documents containing established requirements".

It is easy to see that none of the above normative documents, except for the first, does not contain a word about the GUI. Now take the first basic kit that comes to hand. Find the phrase "about compliance" there. Depending on the wording, you can roughly estimate the age of the designer who issued the documentation :) If you see the "Oath of the GUI in the frame", you are probably a pensioner, and not far off: he was once taught this way, and for 25 years he never thought to look at the normative.

For those who doubt, I will give one more argument. There is still no canceled SNiP 1.06.04-85 "Regulations on the chief engineer (chief architect) of the project. It contains the following provisions:

"2.2. In accordance with the main tasks, the chief engineer (chief architect) of the project is responsible for:

2.2.15. Confirmation in materials project corresponding entry that the design and estimate documentation for the construction of enterprises, buildings and structures has been developed in accordance with the norms, rules, instructions and state standards. Not a word more, demanding to record separately in the working documentation.

Now, for the sake of the collection, I will quote my question, which was included in the Collection of Explanations, Issue 2 “Collection of explanations of the requirements of the standards of the project documentation system for construction (questions and answers). Issue 2. - OJSC "CNS", Moscow, 2012 ":

" 4. Specify the need to bring the "oath of the GIP" on the sheets of general data. This requirement was not even contained in GOST 21.101-97, but a significant number of design organizations continue by inertia to fulfill the requirement of the canceled GOST 1979.

Answer: Yes, by continuing to carry out a "record on the compliance of working documentation", as was the case in GOST 21.102-79, which was canceled in 1993, now these design organizations are violating the current standard. According to clause 4.3.5 of GOST R 21.1101-2009, a record of the compliance of the design documentation with the design assignment issued by the technical specifications, the requirements of the current TR, GOSTs, SP, etc., is given in the general instructions on the general data sheets.

The question continues to stir the minds, and in the Book of explanations, issue 4 “Collection of explanations of the requirements of the standards of the project documentation system for construction (SPDS) (questions and answers). Issue 4. - OJSC "CNS", Moscow, 2015 " read again:

"Question 5: Is it necessary to issue the requirement of clause 4.5.6 of GOST R 21.1101-2013 on the compliance of working documentation with all norms and rules separately, in a frame and put the signature of the GUI?

Answer: In GOST R 21.1101-2013 there are no requirements for any allocation to the frame of a paragraph of general instructions containing a "record on the compliance of the working documentation" and its separate signing by the GUI.

The signature of the person preparing the working documentation (GIP) is mandatory in the main inscriptions on the sheets of general data on working drawings and additional signatures the same person under any information on the same sheets is not required.

Having two GUI signatures on the same document (and most often on the same sheet) won't make documentation twice as good.

Do not confuse the item in the "general instructions" in the working documentation with "certification design organization"in the project documentation"

Enough visa of the GUI on the title page
We are annually audited by the territorial organization of standardization
and there were no comments
I and not only I have already reported that follow your set of documentation as you think is right
It seems that only your organization from the army of design institutes performs the design documentation
Right
There will be no more comments from me.
I repeat that this question has already created a “bite of the teeth” and isn’t it time for us to devote useful time to developing working documentation

I don't understand your displeasure. If you are not interested or you have decided everything for yourself and you really shouldn’t waste time discussing it, I don’t force you to do this. Moreover, your opinion on this topic was known even before its creation. And I wrote to you about this, saying that I was interested not only in my and your opinions on this issue as well as other professionals. Also, I did not in any way claim that my company is superior to me personally, as a designer, in contrast to you. We just have a dispute about the rules of registration and only based on your comments on my project. Of course, I try to protect my project, as you would do in my place. But I am ready to understand everything and make appropriate changes in further design, I think that every self-respecting designer wants to release documentation correctly formatted.

8.7 Title pages volumes of design documentation are signed by:

- the head or chief engineer of the organization;

Chief engineer (architect) of the project.

Signatures of the chief engineer (architect) of the project are mandatory on the sheets of general data on working drawings, the most significant sheets of working drawings, the graphic part of the design and reporting survey documentation;

about the mandatory presence of the oath of the GUI and the list of regulatory documents in the OD, I have already posted links.

From here we draw a conclusion. Despite the lack of comments territorial organization standardization (I don’t think that there are Big Specialists) and your great experience, which I really respect, from the point of view of the GOST 21.1101-2009 you repeatedly mention, you draw up the OD incorrectly, however, like most (if not all) of those present here (yes and not only here), not excluding me.
Who violates to a greater extent, who to a lesser extent, but no one could boast of absolutely competent at least OD (we hope that someone is, especially since they promised) and this is actually regrettable. It remains only to bashfully admit this fact, despite their regalia and merits, to make work on mistakes and continue to fulfill the requirements. Basically, that's why I created this thread.